Tortoise installation complete.         
My HO version of the PRR CP Tower with automatic Tortoise switch machines. The roadbed is restored.
Date: 11/1/2010 Location: Irwin, PA   Map Show Irwin on a rail map Views: 171 Collection Of:   James Falcsik
Author:  James Falcsik
Tortoise installation complete.
Picture Categories: Model This picture is part of album:  Model Railroad Items
Share
User Comments
Name Type Comments Date
Rick Erben General That is a neat project, James. "CP" was an interesting variation of the standard four-track crossovers owing, as you know, to the separation of frt. and psgr. routes - sort of an inverse of View at Duncannon. Your operator will have to be on-the-ball here to keep traffic properly sorted through his plant. 7/16/2012 12:56:18 AM

Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=3110160